Solar Project Complete! > Week 1 - September 26-30
-
Week 1, Step 1: Rock ready for the new floor
It all starts with a big pile of rock, which will go into making the new floor of the coolers in the shed.
-
Week 1, Step 2: Ready for Concrete
The floor was all framed out and ready for concrete at this point.
-
Week 1, Step 3: Caution, Wet Concrete!
The freshly poured concrete makes the project begin to feel real!
-
Week 1, Step 4: Breaking in the new floor
Once the concrete was dried, we could use it to set up everything we needed for the next phases of the project.
-
Week 1, Step 5: Framed!
The next step was to put up the framing for the wall of the new cooler.
-
Week 1, Step 6: Posts for the Southern Wall of Addition.jpg
After pouring the slab and putting up the interior wall, we put up the posts for the new wall that will extend the size of the whole shed.