Solar Project Complete! > Week 2 - October 3 - 8
-
Trusses and Steel For the Addition
We unloaded the trusses and steel for the addition that will support the new solar panels.
-
Spray Foam for the new coolers
Five and a half inches of foam were sprayed in to serve as insulation for the new cooler.
-
Addition beams
We got the beams in place for the new addition.
-
Bobcat with auger
All this work we did at the same time our crew has been harvesting tons (literally) of winter squash - you can see the crates of them in the background.
-
Materials for the addition
Materials for the addition are ready to go!
-
Roof Rafters
The first rafter is going in place - each of these rafters weighs 700 lbs.
-
First Rafters Set and Braced
The first few rafters are set and braced.
-
Steel Wall of Cooler
The steel wall of the new cooler is in place - we are getting close to having this done and ready for winter cabbage.
-
Ramp for the New Cooler
This will be the ramp for the new cooler where we will load and unload the crops.
-
Installation of the Steel Roof
The steel roofing is getting installed.
-
Steel Roof
The steel roof is in place and ready for the Solar Panels, which will get delivered on Tuesday, October 11.